在双层旋转旋转木马运输过程中包括了多少个步骤?

Most of our clients care about the transportation of the double decker merry-go-round rides. They ask: how many steps are included during the double decker carousel transportation? How long is the shipping time? 在 迪尼斯, the shipping process included 4 steps: packaging, loading, export declaration, and customer clearance. The whole shipping time takes about 30-45 天, depending on the detailed transportation distance, 季节, ETC. 下一个, let’s learn about these 4 steps in detail.

transportation steps of the double decker carousel ride
联系我们

如果您对我们的产品感兴趣, 现在可以随时向我们发送询问!